SYNC AUTOMATION

Simulation

Live demo

Run a hotel room's floor control unit in 3D and a building management system in your browser. Insert the key card, change the setpoint and fan speed, dim the lights, close the blind, then trip a pump or cut the mains and handle the alarms. Everything here is a simulation that runs on your device. Nothing is connected to a real building.

Simulation Clock 17:30, day

Floor Control Unit Simulation

One hotel room and the floor control unit behind it: the small controller that runs a room's comfort and lighting. It drives the fan coil unit hidden in the ceiling, reads the thermostat, switches four lighting circuits, moves the blind, and watches the occupancy sensor, the door contact and the key card. Do not disturb and make up room requests show outside the door and in the building management system below.

Room 304, simulated
Drag to turn, pinch or scroll to zoom, right-drag or two fingers to move
Cutaway drawing of hotel room 304: king bed against the headboard wall, TV and desk on the opposite wall, armchair by the window, wardrobe and bathroom beside the entrance, and the fan coil unit in the ceiling above the entrance lobby with its supply grille facing the bed.

Interactive 3D view

Loads about 0.6 MB once. Runs on your device.

Guest, key card and door

Room state
Occupied
Occupancy sensor
No movement
Door contact
Closed
Key card
In the holder

Do not disturb and make up room

Only one can be on at a time. Do not disturb also silences the doorbell. Both light up on the plate outside the door and reach housekeeping through the BMS.

Fan coil unit

Mode
Fan speed
Setpoint
23.0 °C
Room temperature
-
Supply air
-
Chilled water valve
-
Fan
-
Status
-

Lights

  • On or off
  • On or off

Blind

Time of day

The window faces west, so direct sun reaches the room in the afternoon. Sunrise 06:30, sunset 18:30.

Room controller log

Newest first

    Building management system

    The same hotel on one operator screen. Power, chilled water, air handling and guest rooms report live values every second. Trip a pump or cut the mains to see how an alarm is raised, acknowledged and cleared.

    Example hotel Operator screen, simulated

    • Demand- kWPeak today -
    • Energy today- kWhSince midnight
    • Power factor-On target
    • Active alarms0None
    • Comfort- %of rooms within 1.5 °C of setpoint

    Overview

    Demand, last 3 minutes

    • Total -
    • Chiller -

    Equipment

    • Mains supplyUtility
    • Generator G-1Standby
    • Chiller CH-01Running
    • Pump CHWP-01Running
    • Air handler AHU-01Running
    • Room 304 fan coil unitCooling

    Latest alarms

      No alarms. Use "Simulate a fault" below the screen to raise one.

      Simulate a fault

      A pump or breaker trip stops the chiller and the rooms start to warm. A blocked filter raises the pressure across F-01. A mains failure starts the generator, the transfer switch moves over and the chiller is shed until the mains return. Trips stay latched until you acknowledge them and press Reset.

      Want this in your building?

      We design, install and commission room control and building management systems like the ones above, using equipment chosen for your project.