SYNC AUTOMATION
  1. Home
  2. Projects

Projects

Work, documented from brief to handover.

Homes, offices, hotels and industrial sites across Tanzania. Each case study sets out the challenge, the systems installed and what changed for the client.

Case studies

These are placeholder case studies. The renders, locations and figures show the layout only. They will be replaced with real projects, photos and client permission before launch.

Showing 7 projects

Illustrative render of a residential building, standing in for a project photoPlaceholder

ResidentialDar es SalaamYear

Private residence

Challenge
The owners wanted one app for lights, climate, gate and cameras, with normal switches that still work if the internet drops.
Systems
  • Lighting control
  • Climate control
  • CCTV
  • Video intercom
  • Wi-Fi
  • Multi-room audio
Outcome
Arrive, Night and Away scenes on one button. Air conditioning follows occupancy. The gate and door are answered from a phone.
64lighting circuits
11cameras
9Wi-Fi access points

Example figures

Illustrative render of a commercial building, standing in for a project photoPlaceholder

CommercialDar es SalaamYear

Office headquarters

Challenge
A phased fit-out on a live building, with one network and one access system for every floor and tenant.
Systems
  • Structured cabling
  • Wi-Fi
  • Access control
  • Meeting rooms
  • Lighting control
  • BMS
Outcome
Each floor was handed over tested and labelled, with energy metered per tenant and faults reported on one screen.
1,200data points
8floors
14meeting rooms

Example figures

Illustrative render of a hospitality building, standing in for a project photoPlaceholder

HospitalityZanzibarYear

Coastal hotel guest rooms

Challenge
Rooms were cooled all day whether occupied or not, and housekeeping had no view of room status.
Systems
  • Room control units
  • Key card switches
  • Fan coil control
  • Guest Wi-Fi
  • IPTV
  • BMS
Outcome
Empty rooms set back automatically. Do-not-disturb and make-up-room requests appear for housekeeping.
120guest rooms
240fan coil units
1operator screen

Example figures

Illustrative render of a residential building, standing in for a project photoPlaceholder

ResidentialDar es SalaamYear

Apartment buildings

Challenge
Residents, staff and visitors needed different access by time and floor, with a single management office.
Systems
  • Access control
  • Video intercom
  • CCTV
  • Network
Outcome
Visitors are answered from residents' phones. Access is issued and withdrawn from the office without changing locks.
96apartments
2towers
48cameras

Example figures

Illustrative render of a healthcare building, standing in for a project photoPlaceholder

HealthcareArushaYear

Outpatient clinic

Challenge
Staff-only areas, medicine stores and records needed controlled access without slowing clinical work.
Systems
  • Access control
  • CCTV
  • Nurse call integration
  • Network
  • Backup power
Outcome
Doors open by role and shift. Critical systems keep running through outages on UPS and generator.
36controlled doors
18cameras
2wings

Example figures

Illustrative render of a industrial building, standing in for a project photoPlaceholder

IndustrialKurasiniYear

Warehouse and yard

Challenge
A long perimeter, trucks at all hours and frequent power cuts.
Systems
  • Perimeter CCTV
  • Gate control
  • Generator changeover
  • Yard lighting
Outcome
The whole perimeter is covered and recorded. Gates, lights and cameras stay on through outages.
1.2 kmperimeter
24cameras
1changeover panel

Example figures

Illustrative render of a retail building, standing in for a project photoPlaceholder

RetailDar es SalaamYear

Retail showroom

Challenge
Display lighting had to change through the day without staff adjusting switches.
Systems
  • Lighting control
  • Background music
  • CCTV
Outcome
Opening, daytime, evening and closed scenes run on a schedule, with music zones per floor.
6lighting scenes
12music zones
16cameras

Example figures